Tile quote template — m², prep, trims, silicone, tanking and levelling

Tilers lose money when the PDF only shows tile m² and nothing else. This template builds in prep days, primer, levelling, waterproofing where needed, trims, thresholds, silicone, waste allowance and disposal — so the customer is not shocked when the real job is more than ‘tile labour’. Use it in the quote builder with measures from site. Part of the Pro Quoter quote builder — enquiry, measure, quote, job and invoice in one thread.

m²-only quotes hurt tilers

12m² on the quote, 16m² with cuts and niches on the wall. No trim pack. No decoupling. Customer compares your m² rate to a mate who hides prep in the number and looks cheaper.

Example: kitchen diner LVT-style large format — quote one rectangle. Room has four offsets and a island peninsular. You eat three extra hours because structure was wrong.

  • Prep and priming missing from scope
  • Trims and thresholds forgotten
  • Tanking not line-itemed on wet areas
  • Waste and cuts not in the maths

Tiling quote from template

  1. 1

    Measure each area

    Rooms, niches, steps — measure pad on the job.

  2. 2

    Open tile template

    m² lines, prep, trims, adhesive, waste — edit per site.

  3. 3

    Attach photos

    Substrate shots on the quote — why levelling is priced.

  4. 4

    Send PDF

    Customer sees full scope — not a single line.

  5. 5

    Variation for extras

    Feature wall added? Revise before you tile it.

Built for wall and floor tilers

  • Prep visible

    Levelling, boards, primer — customer buys the day.

  • Trim lines

    Bars, nosings, silicone — not afterthoughts.

  • Wet area tanking

    Zones for waterproofing — especially ensuites.

  • Your m² rates from Price Book

    Structure fixed; numbers stay yours.

Full tiling scope on one quote

Tile quote template Pro Quoter
m² plus prep and trims — tile quote template in quote builder.

FAQ

Large format vs standard tile — same template?
Same structure — adjust m² rates, waste % and prep time in lines. Template reminds you; you price.
Stairs and step tiles?
Add stair lines from template or custom lines — do not hide in ‘extras TBC’.
Labour-only when customer supplies tile?
Remove supply lines; keep prep, trims, adhesive if you provide, disposal if relevant.